|
Logistic centre
The building of one of the biggest and most modern logistic centres in the
country was completed in May 2006 - with total area of 17 000 sq.m. and spread area of
12 000 sq.m.
The capacity of the centre is around 14 000 pallet-spaces, as there are
isolated zones for stockkeeping with temperature, humidity, odour,
etc. control. The centre is also be equiped with 7 loading platforms for
trucks, 10 loading platforms for vans, modern warehouse
equipment and three-sided lifters.
In the logistic centre there also are over 3 500 sq. m. office area with
top-level equipment, a parking lot and private security.
|
|